top of page

Storm Water Infiltration Testing for New Development & Redevelopment Projects

New post-construction requirements in San Diego County requires new developments and redevelopments to start incorporating an integrated storm water and runoff management system. These systems are to reduce storm water runoff volume into an onsite basin or bio-filtration system. The standards are described in the Regional Best Management Practices (BMP) Design Manual.

Here at MBCE we have performed infiltration testing, rate assessments and determining factor of safety for areas to manage storm water. Testing and assessments are done after assessing the feasibility criteria for the property to determine if storm water management requirements are applicable to the project. We have submitted infiltration rate assessment reports per the San Diego County requirements.

If you have any questions regarding these procedures please feel free to call or contact us!

Storm Water Infiltration Management
Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Archive
Search By Tags
bottom of page